Container
2019-05-17
There is a general sag during the construction process, blocking the gun and cracking the paint outside.
Through the early inspection of the construction site construction equipment, the product can be adjusted in the field to effectively control the above problems.
The potential risks can be predicted in advance and targeted. details as follows:
1. Strong construction performance and smooth construction;
2. Reduce labor and paint repair costs;
3. Save equipment maintenance costs.
Home· BaoJun· Construction Coating· Industrial Coating· Solution· Project· Service· Intelligent Manufacturing
Address:No. 9 Chuangxin Avenue, Binhai Science and Technology Park, Binhai High-tech Zone, Tianjin,China Zip code:300457
National Hotline
400-022-5055